Using the Westerbork Synthesis Telescope as a Tied array
Tony Foley
Introduction to the use of the Tied Array
Operating the tied array
Setting up the Tied Aray
DCB Total powers
Phase zero values
Delay offsets
Amplitudes
Spacings
How to we calibrate the tied-array?
Known sensitivity
Known system temperatures
Accurately phased array
Total Power of added signals
What is not understood about the tied array 21 August 1996
Tied array losses in DCB
Phase and delay differences between DCB bands
Phase steps in the RFDS
Phase and delay differences between different sidebands of DCB
Total powers from ASTI
Terminations from the ASTI
What causes 'SYNC ERRORS' ?
Does the tied-array move when telescopes do?
Are there effects from 3ns delay steps
How much delay do we have in the cables and backend?
VLBI and Tied array
What is VLBI?
What is needed for VLBI to work?
Same source
Same time
Same frequency
Same polarization(s)
Guidelines for the use of the WSRT in VLBI
VLBI Schedules
Block Schedule
Making schedules
PC-SCHED
Schedule transfer
Checking Schedules
Transfer to field system and telescope control computer
Running the schedule
VLBI specific Setup procedures
Mk3 equipment total powers
Default observations
VLBI Checklists
Observing Pulsars with the Flexibile Filter Bank
General
WSRT Filterbank Back-End Overview
Field of View
Sky Frequency
Number of Channels
Bandwidth
DC Removal
Smoothing
Sampling
Timing
Digitizing
Sensitivity
Recording Space
Maximum Recording Time
Long Spectra (WADDS)
General
Hardware Setups
Hardware devices used
Correlator Configurations
Mk3 standard setups
Mark 3 modes and their track assignments
Standard Sky Frequencies
18cm
6cm
21cm (EVN standard)
92cm
49cm (nonstandard)
3.6/13cm ("S/X" band)
SNAP commands
Minimum SNAP commands
Other useful SNAP commands
Default settings for tied-array VLBI
General
Dipoles
Control codes
Other codes
Mk3 Mixing scheme
General
Polarization
Video Converter settings
Different wavebands
Tied-array setups per wavelength
6cm
18cm
92cm
WSRT Mixing schemes
General
Equations
Checklists for a VLBI session
One Week before (for VLBI friend)
Two days before (for VLBI friend)
During Observations (for Waarnemers)
Taking over a shift
Checks during a shift
Checks before going to sleep
Checks after VLBI session (for VLBI friend)
ASTI Total Power setup
The VLBINFO account
Instraal test
WADDS checklist
Concepts Index
This document was generated using the
texi2html
translator version 1.36.