====== Stop-day activities Dec 6, 2016 ====== Coordinated by Reinoud. Prefered end time 15:00. The order of the stop-day will be Cobalt, CEP4, CEP3. ==== Network ==== * Swap ports of Cobalt node 8 to address the UDP packet loss (Arjen) * Cabinet D8 need to power down to replace a power meter at 10:00 (Kees) \\ (affected systems: lcs116, lcs117, mgt001, all portal virtual machines: agro, cosmic, dep1, dep2, geo, geolofar, knmi, nap, portal, smtp) * Cabinet A1 (Dragnet) needs to power down to replace a power meter * All NL LCU's need to reload ntpd using Ansible. It will change the priority of ntpd to -6. ==== LCU replacement ==== * All (!) International stations will replace their LCUs. Uninterrupted network access is vital. **The international LCU's will be switched off at 08:15 LT** Note: The LCU in the Concentrator Node will be replaced Jan 3, 2017 ===== Systems ===== ==== Central ==== * Update spacewalk host (make image first!) ==== cep2 ==== * Reboot of all nodes ==== Cobalt ==== * Reset idrac * Reboot ==== CEP3 ==== * Do a filesystem check on /data of lof001-022 (Done by Robin) * Reboots * Reset idrac ==== CEP4 ==== * ? ==== Dwingeloo machines ==== * dop215 (Northstar) reboot * dop216 (Proposal) reboot * dop303 (Lofar MoM) reboot * dop293 (MySQL database) reboot ===== Software updates ===== ==== MAC/SAS ==== * none ==== CEP2 ==== * none ==== CEP3 ==== * Make LOFAR Release 2.19 default version * Make WSClean 2.0 the default version ==== CEP4 ==== * none