Meetings :: KSP Synergy meeting (25 May 2007, Amsterdam)

Date 25 May 2007
Location Amsterdam
Participants C. Vogt, I. Snellen, Peter Barthel, A. Horneffer, B. Stappers, R. Fender, G. de Bruyn, L. Koopmans, H. Rottgering, L. Baehren, R. Wijers

TOC:

Invitation

As Friday and thus, our meeting on KSP (observation) synergies draws closer, it is time to think about preparing a bit for the meeting. The meeting will be held on Friday, May 25, starting at 11am - 3pm in Amsterdam (Pannekoek kamer at the Pannekoek Institut/UvA)

The main aim of this meeting is to identify where and when observation and (re-)processing time can be shared and/or optimised between the KSPs. A secondary goal would be to flag further synergies which should be discussed at a later meeting.

In order to achieve this, a little preparation from all of us might be necessary. I attach to this email a document which Michiel van Haarlem drafted a year ago concerning observation requests from each of the KSPs. It would be great if each KSP could check the numbers and update the document if necessary by Wednesday night and send their updates to me for further distribution. These summaries should contain the following points:

Agenda

11.00 Welcome + Intro (Wijers & Vogt)

Setting the scene: Short presentations by the KSP concerning their observation proposal (detailing the points above)

11.10 EoR - de Bruyn
11.20 TKP - Fender
11.30 CR - Bähren
11.40 Survey - Röttgering
11.50 Discussion: Identify possible synergies
12.30 lunch
13.30 Discussion: Feasiblity of identified synergies
14.15 Disucssion: Where to go from here? - Realistic observation schedule
14.30 Discussion: Flag further synergies between KSP's (and foreign KSP's) to be explored at follow-up meetings
15.00 End of Meeting

Notes from the presentations

Introduction (Corina)

Epoch of Reionization (Ger)

Transients (Rob)

Cosmic Rays (Lars)

Surveys

Notes from the discussion(s)

Will the scheduling software be able to consider overlap in the submitted observations or is this something which needs to be done by the observers themselves? Some scheduling software is able to do this. Questions is however how the observation parameters need to be defined/provided to enable automatic combination.

Roll-out plans:

Coordination of the various observations and their execution strongly depends on the available infrastructure (including software); some of the required pieces can be identified based on the worked out processing pipelines. Relevant is also the development plan from the side of the project (station roll-out, central software capabilities).

Testing vs. science:

What about coordination of requirements and priorities? To some degree an overview has been compiled with the SEG and the USG, based on the available input from the KSPs.

Possibility of sub-stations, to combine LBA and HBA observation? This might introduce additional flexibility in combining observations or have observations taking data in parallel in both frequency ranges.

Feedback from DCLA review:

Not yet considered: international KSPs and their contribution/requirements.

List of identified synergies

Start with synergies in final LOFAR: brief document discussion suggested synergies, including

Synergy areas in combination of observations

  1. Targeted observations of known transient sources/pulsars in Survey fields [Ben]
  2. Targeted observations of known transient sources/pulsars in EoR fields [Ben, Ger]
  3. Pulsar surveys in EoR fields [Ben, Ger]
  4. Pulsar surveys in Survey fields [Ben]
  5. RSM fields & Deep Surveys → technical requirement: parallel handling of long and short baselines [Rob]
  6. CR with Surveys LBA observations [Andreas,Huub]
  7. CR with Transients LBA observations [Andreas,Ralph]
  8. Galactic foreground for EoR from Surveys (30 MHz) and Transients (120 MHz) [Leon,Peter,Rob]
  9. Nearby galactic and extragalactic Pulsars in Survey fields [Ben,Rafaella]

Persons listed in brackets [] are to provide names of the persons to actually take up the task to work out the synergies; information should be provided within 1 week notice.

Synergy areas in processing

Timeline

Action items

Item Description Responsible
01 Assign people to work out synergy areas in combination of observations participants listed in brackets above
02 Assign people to work out synergy areas in processing participants listed in brackets above