Coordinated by Teun. Prefered end time 15:00.
The order of the stop-day will be Cobalt, CEP4, CEP3. This way we have time to test with new MCU & CCU hosts (Arno)
(Arjen will swap ports of Cobalt node 8 to address the UDP packet loss)
Postponed. This requires test-time. We want to have mcu002 & ccu002 first.
All equipment in rack D1 will be put on no-break power. STARTS AT 11:00 LT Involved machines:
1u ccu099 1u sas099 1u mcu099 1u lu ldb001 (powered off) 1u ldb002 1u 1u ldb003 1u lcs120 (Virtual machines: ccu002 kdcprod lcs158 mcu002 mcu005 mcu006 scu001 scu099 smu002) 1u lcs121 (Virtual machines: ccu199 kdctest lcs153 lcs155 lcs156 lcs157 mcu199 sas199) 1u lcs122 (Virtual machines: -) 1u 8u lse021 (powered off) 8u lse024 8u lexar001 8u lexar002 1u lfe001