Stop-day activities Nov 1, 2016

Coordinated by Teun. Prefered end time 15:00.

The order of the stop-day will be Cobalt, CEP4, CEP3. This way we have time to test with new MCU & CCU hosts (Arno)

Network

(Arjen will swap ports of Cobalt node 8 to address the UDP packet loss)

Postponed. This requires test-time. We want to have mcu002 & ccu002 first.

Systems

No-Break

All equipment in rack D1 will be put on no-break power. STARTS AT 11:00 LT Involved machines:

1u ccu099
1u sas099
1u mcu099
1u
lu ldb001 (powered off)
1u ldb002
1u
1u ldb003
1u lcs120 (Virtual machines: ccu002 kdcprod lcs158 mcu002 mcu005 mcu006 scu001 scu099 smu002)
1u lcs121 (Virtual machines: ccu199 kdctest lcs153 lcs155 lcs156 lcs157 mcu199 sas199)
1u lcs122 (Virtual machines: -)
1u
8u lse021 (powered off)
8u lse024
8u lexar001
8u lexar002
1u lfe001

cep2

Cobalt

CEP3

CEP4