public:lsm_new:lsm_2015

LOFAR Status Meetings

LOFAR Status Meetings (LSM), presenting updates of the status of the telescope and discussing recent developments, are held monthly at ASTRON. The meetings are also broadcast via Vidyo to everyone interested.

Please use a headset and please mute the microphone in the Evo session as long as you do not want to raise a question or say something.

LSM Archive2016201520142013201220112010200920082007


9 December 2015
M. Iacobelli Array Status and Observatory Update
H. Holties CEP4 status update
J. Schaap LTA status update
H. Junklewitz Update from the MKSP Busy Week
25 November 2015
A. Shulevski Array Status and Observatory Update
V. Kondratiev LOFAR census of non-recycled pulsars
28 October 2015
E. Orru' Array Status and Observatory Update
G. de Bruyn Rotating CS013
V. Kondratiev LOFAR census of millisecond pulsars
14 October 2015
S. ter Veen Array Status and Observatory Update
V. Kondratiev LOFAR pulsar flux calibration
S. ter Veen Update from the CR group
30 September 2015
R. Pizzo Array Status and Observatory Update
E. Orru' The Calibration and Imaging Tiger Team 2
D. Mulcahy Overview of Polarisation Busy week
C. Vaneck Testing Ionospheric Faraday Rotation correction for LOFAR
16 September 2015
L. Cerrigone Array Status and Observatory Update
J. Schaaps LTA Update
M. Brentjens Aperture holography
2 September 2015
L. Cerrigone Array Status and Observatory Update
A. Schoenmakers Software Development Update
A. Deller Report from the Long Baseline Busy Week
19 August 2015
M. Iacobelli Array Status and Observatory Update
R. oonk Low-frequency CRRLs with LOFAR: an Update
J. Hessels DRAGNET and the search for new pulsars and fast transients with LOFAR
22 July 2015
R. Fallows Array Status and Observatory Update
H. Junklewitz LOFAR MKSP Polarisation Busy Week
J. Broderick LOFAR Monitoring of the 2015 V404 Cyg Outburst
8 July 2015
E. Orru' Array Status and Observatory Update
T. J. Dijkema CITT update
J. Rachen Update from the Cosmic Rays working group
K. Sendlinger The LOFAR view on NGC 5033
24 June 2015
M. Iacobelli Array Status and Observatory Update
H. Holties Software developoment update
I. van Bemmel Lessons learned from LOFAR LBA: clock/TEC separation
10 June 2015
S. ter Veen Array Status and Observatory Update
J. D. Mol The LOFAR network reconfiguration
27 May 2015
L. Cerrigone Array Status and Observatory Update
A. Renting LTA status update
G. Heald MSSS status update
13 May 2015
R. Fallows Array Status and Observatory Update
G. Heald LOFAR CITT status update
D. Mulcahy Status update from the LOFAR Polarization Busy Week
29 April 2015
E. Orru Array Status and Observatory Update
J. D. Mol The LOFAR Network Reconfiguration
E. Varenius Supernova remnants and fermi bubbles: LOFAR images of M82 and NGC3079
15 April 2015
R. Pizzo Array Status and Observatory Update
P. Prasad Moonlighting with AARTFAAC
J. Harwood The low energy electron population in the lobes of FR-II radio galaxies
1 April 2015
M. Iacobelli Array Status and Observatory Update
M. Brentjens LOFAR’s partial solar eclipse
A. Renting LTA status update
G. Heald MSSS status report and update
A. Shulevsky A LOFAR view of the radio relic B2 0924+30
18 March 2015
S. ter Veen Array Status and Observatory Update
T. J. Dijkema The Calibration and Imaging Tiger Team: progress update
G. de Bruyn Some recent results on 3C196
A. Clarke LOFAR observations of Abell 1682
4 March 2015
M. Iacobelli Array Status and Observatory Update
H. Vedantham Lunar occultation of the diffuse radio sky: Improved results from cycle 1 data
M. Brienza Exploring the remnant radio galaxy population with LOFAR
18 February 2015
C. Toribio Array Status and Observatory Update
H. Holties LTA status update
E. Mahony The Lockman Hole with LOFAR: an update
W. Williams Deep HBA Imaging - The Bootes Field
04 February 2015
L. Cerrigone Array Status and Observatory Update
F. de Gasperin Strategies for LBA calibration and imaging
N. Jackson LOBOS: the LOFAR LOng-Baseline calibratOr Survey
V. Heesen LBA and HBA of 3C31
21 January 2015
E. Orru' Array Status and Observatory Update
G. Heald MSSS status update
A. Offringa Results of applying MWA's WSClean imager to LOFAR data
A. Nelles Parametrizing the radio signal of cosmic ray induced air showers as measured with LOFAR
07 January 2015
R. Pizzo Array Status and Observatory Update
H. Holties LTA status update
W. Frieswijk Making LOFAR data public
V. Kondratiev LOFAR MSP population. Pulsar flux calibration
  • Last modified: 2017-03-08 15:27
  • by 127.0.0.1