public:stopdayactivities_19mar2019

This is an old revision of the document!


Stop-day activities March 19-20, 2019


Coordinator Jasmin Klipic roadmin@astron.nl
Software Support Auke Klazema softwaresupport@astron.nl
Science, Operations and Support Marco I. sos@astron.nl
Observer Richard Blaauw observer@astron.nl

Description of stopday procedures
LOFAR Schedule cycle 11

  • √ Reboots (Hopko)
  • √ restart IB Switch
  • √ Block access at 08:00 (Teun)
  • √ Reboots (Kees)
  • √ Check IDRAC of lhd001 for clearance of corrected memory errors.
  • √ lof018 Disk 7 performed an auto-reseat
  • √ Reboots (Hopko)
  • √ restart IB Switches
  • √ Reboots (Reinoud)
  • √ reboot (Teun)
  • √ Update & reboot (Jasmin)
  • OS upgrade and reboot (Teun)
  • OS upgrade and reboot (Teun)
  • √ (NFS server) Distro update to Ubuntu18 (Jasmin)
  • ✘ ldb003: upgrade firmware, generate Dell report for broken network card (10G) (Jasmin) No 10G card found.
  • √ Update & reboot (Reinoud)
  • None
  • None
  • None
✘ Updating SASGateway code and configuration on MCU001        (Auke)
✘ Updating FeedbackService code and configuration on MCU001   (Auke)
✘ Updating MACScheduler code and configuration on MCU001      (Auke)
✘ Updating SASGateway code and configuration on CCU001        (Auke)
✘ Updating LCU code and configuration on available stations (at minimum we need the configurations in place)
✔ Create database roles for OTDB (Postgres) and change ACL. (Reinoud)

The users were created but the code could not be rolled out because more code changes are needed. If times allows us to make those changes it will be released in 3.3 otherwise some code will need to be reverted (OTDBconnection.cc).

  • ✘ Upgrade numpy to 1.16.2, scipy 1.2.1 (Reinoud)
  • None
  • None
  • None
  • none
  • none
  • √ Update & Reboot (Jasmin)
  • -
  • Last modified: 2019-04-02 14:43
  • by Auke Klazema