public:stopdayactivities_19mar2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:stopdayactivities_19mar2019 [2019-04-02 14:43] – [MAC/SAS] Auke Klazemapublic:stopdayactivities_19mar2019 [2019-12-02 14:02] (current) – [Review meeting] Reinoud Bokhorst
Line 83: Line 83:
 ==== MAC/SAS ==== ==== MAC/SAS ====
  
-  ✘ Updating SASGateway code and configuration on MCU001        (Auke) +  ✘ Updating SASGateway code and configuration on MCU001        (Auke) 
-  ✘ Updating FeedbackService code and configuration on MCU001   (Auke) +  ✘ Updating FeedbackService code and configuration on MCU001   (Auke) 
-  ✘ Updating MACScheduler code and configuration on MCU001      (Auke) +  ✘ Updating MACScheduler code and configuration on MCU001      (Auke) 
-  ✘ Updating SASGateway code and configuration on CCU001        (Auke) +  ✘ Updating SASGateway code and configuration on CCU001        (Auke) 
-  ✘ Updating LCU code and configuration on available stations (at minimum we need the configurations in place) +  ✘ Updating LCU code and configuration on available stations (at minimum we need the configurations in place) 
-  ✔ Create database roles for OTDB (Postgres) and change ACL. (Reinoud)+  ✔ Create database roles for OTDB (Postgres) and change ACL. (Reinoud)
  
 The users were created but the code could not be rolled out because more code changes are needed. The users were created but the code could not be rolled out because more code changes are needed.
Line 120: Line 120:
   * √ Update & Reboot (Jasmin)   * √ Update & Reboot (Jasmin)
  
-==== Review meeting ==== 
  
-  * - 
  • Last modified: 2019-04-02 14:43
  • by Auke Klazema