public:stopdayactivities_1nov2016

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revisionBoth sides next revision
public:stopdayactivities_1nov2016 [2016-10-31 07:56] – [Stop-day activities Nov 1, 2016] gritpublic:stopdayactivities_1nov2016 [2016-11-01 10:18] – [No-Break] Reinoud Bokhorst
Line 3: Line 3:
 Coordinated by Teun. Prefered end time 15:00. Coordinated by Teun. Prefered end time 15:00.
  
 +The order of the stop-day will be Cobalt, CEP4, CEP3.
 +This way we have time to test with new MCU & CCU hosts (Arno)
 ==== Network ==== ==== Network ====
  
-Arjen will swap ports of Cobalt node 8 to address the UDP packet loss.+(Arjen will swap ports of Cobalt node 8 to address the UDP packet loss
 + 
 +Postponed. This requires test-time. We want to have mcu002 & ccu002 first.
 ===== Systems ===== ===== Systems =====
  
Line 22: Line 26:
 1u ldb003 1u ldb003
 1u lcs120 (Virtual machines: ccu002 kdcprod lcs158 mcu002 mcu005 mcu006 scu001 scu099 smu002) 1u lcs120 (Virtual machines: ccu002 kdcprod lcs158 mcu002 mcu005 mcu006 scu001 scu099 smu002)
-1u lcs121 (Virtual machines: ccu199 kdctest lcs153 lcs155 lcs156 lcs157 mcu199) +1u lcs121 (Virtual machines: ccu199 kdctest lcs153 lcs155 lcs156 lcs157 mcu199 sas199
-1u lcs122 (Virtual machines sas199+1u lcs122 (Virtual machines: -)
 1u 1u
 8u lse021 (powered off) 8u lse021 (powered off)
  • Last modified: 2017-03-08 15:27
  • by 127.0.0.1