public:stopdayactivities_1nov2016

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:stopdayactivities_1nov2016 [2016-10-24 14:13] – [No-Break] gritpublic:stopdayactivities_1nov2016 [2017-03-08 15:27] (current) – external edit 127.0.0.1
Line 3: Line 3:
 Coordinated by Teun. Prefered end time 15:00. Coordinated by Teun. Prefered end time 15:00.
  
 +The order of the stop-day will be Cobalt, CEP4, CEP3.
 +This way we have time to test with new MCU & CCU hosts (Arno)
 +==== Network ====
  
 +(Arjen will swap ports of Cobalt node 8 to address the UDP packet loss)
 +
 +Postponed. This requires test-time. We want to have mcu002 & ccu002 first.
 ===== Systems ===== ===== Systems =====
  
 ==== No-Break ==== ==== No-Break ====
  
-All equipment in rack D1 will be put on no-break power.+All equipment in rack D1 will be put on no-break power. **STARTS AT 11:00 LT** 
 Involved machines: Involved machines:
 <code> <code>
Line 19: Line 25:
 1u 1u
 1u ldb003 1u ldb003
-1u lcs120 +1u lcs120 (Virtual machines: ccu002 kdcprod lcs158 mcu002 mcu005 mcu006 scu001 scu099 smu002) 
-1u lcs121 +1u lcs121 (Virtual machines: ccu199 kdctest lcs153 lcs155 lcs156 lcs157 mcu199 sas199) 
-1u lcs122+1u lcs122 (Virtual machines: -)
 1u 1u
 8u lse021 (powered off) 8u lse021 (powered off)
Line 34: Line 40:
 ==== Cobalt ==== ==== Cobalt ====
  
 +  * Reset idrac
   * Reboot   * Reboot
  
Line 40: Line 47:
   * Do a filesystem check on /data of lof001-022 (Done by Robin)   * Do a filesystem check on /data of lof001-022 (Done by Robin)
   * Reboots   * Reboots
 +  * lof022 reseat memory card
  
  
Line 47: Line 55:
  
 ===== Software updates ===== ===== Software updates =====
 +
 +==== MAC/SAS ====
 +  * Take into production by Arno: MCU002 (CentOS7)
 +  * Take into production by Arno: CCU002 (CentOS7)
  
 ==== CEP2 ==== ==== CEP2 ====
  • Last modified: 2016-10-24 14:13
  • by grit