public:stopdayactivities_1nov2016

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:stopdayactivities_1nov2016 [2016-10-27 13:47] – [No-Break] gritpublic:stopdayactivities_1nov2016 [2017-03-08 15:27] (current) – external edit 127.0.0.1
Line 3: Line 3:
 Coordinated by Teun. Prefered end time 15:00. Coordinated by Teun. Prefered end time 15:00.
  
 +The order of the stop-day will be Cobalt, CEP4, CEP3.
 +This way we have time to test with new MCU & CCU hosts (Arno)
 +==== Network ====
  
 +(Arjen will swap ports of Cobalt node 8 to address the UDP packet loss)
 +
 +Postponed. This requires test-time. We want to have mcu002 & ccu002 first.
 ===== Systems ===== ===== Systems =====
  
Line 20: Line 26:
 1u ldb003 1u ldb003
 1u lcs120 (Virtual machines: ccu002 kdcprod lcs158 mcu002 mcu005 mcu006 scu001 scu099 smu002) 1u lcs120 (Virtual machines: ccu002 kdcprod lcs158 mcu002 mcu005 mcu006 scu001 scu099 smu002)
-1u lcs121 (Virtual machines: ccu199 kdctest lcs153 lcs155 lcs156 lcs157 mcu199) +1u lcs121 (Virtual machines: ccu199 kdctest lcs153 lcs155 lcs156 lcs157 mcu199 sas199
-1u lcs122 (Virtual machines sas199+1u lcs122 (Virtual machines: -)
 1u 1u
 8u lse021 (powered off) 8u lse021 (powered off)
  • Last modified: 2016-10-27 13:47
  • by grit