public:stopdayactivities_24sep2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
public:stopdayactivities_24sep2019 [2019-09-24 06:45] – [Stop-day activities September 24-25, 2019] Richard Blaauwpublic:stopdayactivities_24sep2019 [2019-09-25 08:02] (current) Reinoud Bokhorst
Line 8: Line 8:
 ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\ ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\
 ⇒ [[https://docs.google.com/spreadsheets/d/1WwH_cdZFH8CGSAM5SDokb-rZmm6G9mKz8LcTQZUc5fY/edit?ts=5d00b1e6#gid=0|LOFAR Schedule cycle 1]]2 ⇒ [[https://docs.google.com/spreadsheets/d/1WwH_cdZFH8CGSAM5SDokb-rZmm6G9mKz8LcTQZUc5fY/edit?ts=5d00b1e6#gid=0|LOFAR Schedule cycle 1]]2
- 
-\\ 
- 
  
 ===== Systems ===== ===== Systems =====
- 
-====   ==== 
  
 ==== Cobalt2 ==== ==== Cobalt2 ====
  
-  * Reboots (ROadmin) +  * ✔ Reboots (ROadmin) 
-  * restart IB Switch +  * ✘ restart IB Switch 
-  * recabling 10G interfaces (Arjen K (vlans??)JDM) +  * ✔ recabling 10G interfaces (Arjen K (vlans??)JDM)
  
 ==== CEP3 ==== ==== CEP3 ====
  
-  * Block access at 08:00 (Reinoud) +  * ✔ Block access at 08:00 (Reinoud) 
-  * Reboots (Kees)+  * ✔ Reboots (Kees)
  
 ==== CEP4 ==== ==== CEP4 ====
  
-  * reconfigure SLURM (jasmin+  * ✔ reconfigure SLURM (Reinoud
-  * Reboots (jasmin+  * ✔ Reboots (Reinoud
-  * restart IB Switches (skipped) +  * ✘ restart IB Switches (skipped)
  
 ==== LEXARS ==== ==== LEXARS ====
  
-  * Reboots+  * ✔ Reboots
  
 ==== LCU ==== ==== LCU ====
  
-  * Upgrade to CentOS 7.(Jasmin) wait for confirmation +  * ✔ Upgrade to CentOS 7.(Jasmin) wait for confirmation 
-  * reboot (Jasmin) +  * ✔ reboot (Jasmin)
  
 ==== Portals ==== ==== Portals ====
  
-  * Update & reboot (Teun)+  * ✔ Update & reboot (Jasmin)
  
 ==== Central Services lcs020 .. lcs030 ==== ==== Central Services lcs020 .. lcs030 ====
  
-  * OS upgrade and reboot (Teun+  * ✔ OS upgrade and reboot (All
-  * Switch-over ldb003 / lcs119 (dbsrv1)+  * ✔ Switch-over ldb003 / lcs119 (dbsrv1) (Reinoud)
  
 ==== LTA ==== ==== LTA ====
  
-  * Update & reboot (Reinoud)+  * ✔ Update & reboot (Reinoud)
  
 ==== Aartfaac ==== ==== Aartfaac ====
Line 64: Line 56:
 ==== Core switches & network ==== ==== Core switches & network ====
  
-  * Warm reset PD0. RD0, RD1 (Arjen K 3 p.m) +  * ✔ Warm reset PD0. RD0, RD1 (Arjen K 3:15 p.m) 
-  * SutfNet7 to 8 migration (LOFAR internet connection). +  * ✔ SurfNet7 to 8 migration (LOFAR internet connection).
  
 ==== DWG Lofar Systems ==== ==== DWG Lofar Systems ====
  
-  * Update & Reboot (Reinoud)+  * ✔ Update & Reboot (All)
  
 ===== Software updates ===== ===== Software updates =====
  • Last modified: 2019-09-25 08:02
  • by Reinoud Bokhorst