public:stopdayactivities_24sep2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
Next revisionBoth sides next revision
public:stopdayactivities_24sep2019 [2019-09-11 13:09] – created Jasmin Klipicpublic:stopdayactivities_24sep2019 [2019-09-19 14:42] – [CEP4] Jasmin Klipic
Line 2: Line 2:
  
 ^Coordinator|Jasmin Klipic|klipic@astron.nl| ^Coordinator|Jasmin Klipic|klipic@astron.nl|
-^Software Support|Mattia Mancini|mancini@astron.nl|+^Software Support|Jorrit Schaap|schaap@astron.nl|
 ^Science, Operations and Support|Bernard Asabere|asabere@astron.nl| ^Science, Operations and Support|Bernard Asabere|asabere@astron.nl|
 ^Observer|Henk Mulder|observer@astron.nl| ^Observer|Henk Mulder|observer@astron.nl|
  
 ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\ ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\
-⇒ [[https://docs.google.com/spreadsheets/d/1sjcDGm0yIKWaud_1KN1iV27VdFR15MWkZpDNTzlX5L4/edit?ts=5bdc491a#gid=274896772|LOFAR Schedule cycle 11]]+⇒ [[https://docs.google.com/spreadsheets/d/1WwH_cdZFH8CGSAM5SDokb-rZmm6G9mKz8LcTQZUc5fY/edit?ts=5d00b1e6#gid=0|LOFAR Schedule cycle 1]]2
  
 ===== Systems ===== ===== Systems =====
  
-==== Cobalt ==== +====   ====
- +
-  * Reboots (Hopko) +
-  * restart IB Switch+
  
 ==== Cobalt2 ==== ==== Cobalt2 ====
  
-  * Reboots (Hopko)+  * Reboots (ROadmin) 
 +  * restart IB Switch 
 +  * recabling 10G interfaces (Arjen K (vlans??)JDM) 
  
 ==== CEP3 ==== ==== CEP3 ====
Line 27: Line 27:
 ==== CEP4 ==== ==== CEP4 ====
  
-  * Reboots +  * reconfigure SLURM (jasmin) 
-  * restart IB Switches+  * Reboots (jasmin) 
 +  * restart IB Switches (skipped) 
  
 ==== LEXARS ==== ==== LEXARS ====
Line 36: Line 38:
 ==== LCU ==== ==== LCU ====
  
-  * Upgrade to CentOS 7.6 (Jasmin)+  * Upgrade to CentOS 7.6 (Jasmin) wait for confirmation
   * reboot (Jasmin)   * reboot (Jasmin)
 +
  
 ==== Portals ==== ==== Portals ====
Line 46: Line 49:
  
   * OS upgrade and reboot (Teun)   * OS upgrade and reboot (Teun)
 +  * Switch-over ldb003 / lcs119 (dbsrv1)
  
 ==== LTA ==== ==== LTA ====
Line 57: Line 61:
 ==== Core switches ==== ==== Core switches ====
  
-  * Warm reset PD0. RD0, RD1+  * Warm reset PD0. RD0, RD1 (Arjen K 3 p.m) 
  
 ==== DWG Lofar Systems ==== ==== DWG Lofar Systems ====
Line 98: Line 103:
  
 ====   ==== ====   ====
 +
 +\\
  
  
  • Last modified: 2019-09-25 08:02
  • by Reinoud Bokhorst