public:stopdayactivities_24sep2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revisionBoth sides next revision
public:stopdayactivities_24sep2019 [2019-09-19 08:13] – [Cobalt] Jasmin Klipicpublic:stopdayactivities_24sep2019 [2019-09-23 07:52] – [Core switches] Reinoud Bokhorst
Line 2: Line 2:
  
 ^Coordinator|Jasmin Klipic|klipic@astron.nl| ^Coordinator|Jasmin Klipic|klipic@astron.nl|
-^Software Support|Mattia Mancini|mancini@astron.nl|+^Software Support|Arno Schoenmakers|schoenmakers@astron.nl|
 ^Science, Operations and Support|Bernard Asabere|asabere@astron.nl| ^Science, Operations and Support|Bernard Asabere|asabere@astron.nl|
-^Observer|Henk Mulder|observer@astron.nl|+^Observer|Paul V. Dijk|observer@astron.nl|
  
 ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\ ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\
-⇒ [[https://docs.google.com/spreadsheets/d/1sjcDGm0yIKWaud_1KN1iV27VdFR15MWkZpDNTzlX5L4/edit?ts=5bdc491a#gid=274896772|LOFAR Schedule cycle 11]]+⇒ [[https://docs.google.com/spreadsheets/d/1WwH_cdZFH8CGSAM5SDokb-rZmm6G9mKz8LcTQZUc5fY/edit?ts=5d00b1e6#gid=0|LOFAR Schedule cycle 1]]
 + 
 +\\ 
  
 ===== Systems ===== ===== Systems =====
  
 ====   ==== ====   ====
- 
  
 ==== Cobalt2 ==== ==== Cobalt2 ====
  
   * Reboots (ROadmin)   * Reboots (ROadmin)
 +  * restart IB Switch
 +  * recabling 10G interfaces (Arjen K (vlans??)JDM)
  
  
Line 26: Line 30:
 ==== CEP4 ==== ==== CEP4 ====
  
-  * Reboots +  * reconfigure SLURM (jasmin) 
-  * restart IB Switches+  * Reboots (jasmin) 
 +  * restart IB Switches (skipped) 
  
 ==== LEXARS ==== ==== LEXARS ====
Line 35: Line 41:
 ==== LCU ==== ==== LCU ====
  
-  * Upgrade to CentOS 7.6 (Jasmin)+  * Upgrade to CentOS 7.6 (Jasmin) wait for confirmation
   * reboot (Jasmin)   * reboot (Jasmin)
 +
  
 ==== Portals ==== ==== Portals ====
Line 46: Line 53:
   * OS upgrade and reboot (Teun)   * OS upgrade and reboot (Teun)
   * Switch-over ldb003 / lcs119 (dbsrv1)   * Switch-over ldb003 / lcs119 (dbsrv1)
- 
  
 ==== LTA ==== ==== LTA ====
Line 56: Line 62:
   * None   * None
  
-==== Core switches ====+==== Core switches & network ==== 
 + 
 +  * Warm reset PD0. RD0, RD1 (Arjen K 3 p.m) 
 +  * SutfNet7 to 8 migration (LOFAR internet connection).
  
-  * Warm reset PD0. RD0, RD1 
  
 ==== DWG Lofar Systems ==== ==== DWG Lofar Systems ====
Line 99: Line 107:
  
 ====   ==== ====   ====
 +
 +\\
  
  
  • Last modified: 2019-09-25 08:02
  • by Reinoud Bokhorst