Stop-day activities December 5, 2017


Coordinator Teun Grit roadmin@astron.nl
Software Support Arno Schoenmakers softwaresupport@astron.nl
Science, Operations and Support Sander ter Veen sos@astron.nl
Observer Henk Mulder observer@astron.nl

Planned end time: 15:00 LT (CET).

LOFAR Schedule cycle 9

  • Reboots and idrac reboots.
  • Restart the Infiniband Switches
  • All nodes: file system check and reboot.
  • Fix hosts file (postponed to 5 December)
  • Performance tests: ib perftest's, obdfilter-survey, lnet self-test, mdtest (partly done)
  • Reinstall cpu49, look at cpu27
  • ok
  • Reboots (only 7 were rebooted)
  • Reboot lcs120 (391 days up): Active VM's: mcu006 lcs158 scu099 scu001 ccu001 mcu001 smu001 mcu005 kdcprod
  • Reboot lcs121 (391 days up): Active VM's: lcs156 lcs157 ccu199 kdctest mcu199 smu199 sas199 lcs153 lcs155
  • Reboot lcs122 (293 days up): Active VM's: gsm ldb199 zabbix3 tmysql perfsonar ansje
  • Reboot lcs102, lcs103, lcs104
  • none
  • none
  • none
  • PyBDSF to 1.8.13 by default (also adapt module lofar!)
  • Dysco 1.1
  • Install astroquery python module
  • Fix SLURM reservations persistence
  • Install virtualenv for Python 2 and 3
  • h5py for Python3
  • none
  • none
  • none
  • Update Ingest XML/RPC service to support ID Service.
  • none
  • Last modified: 2017-11-29 08:09
  • by Reinoud Bokhorst