public:stopdayactivities_5jun2018

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:stopdayactivities_5jun2018 [2018-05-14 07:59] – [Stop-day activities June 5-6, 2018] Reinoud Bokhorstpublic:stopdayactivities_5jun2018 [2018-06-05 11:52] (current) – [Stop-day activities June 5-6, 2018] Reinoud Bokhorst
Line 4: Line 4:
  
 ^ Coordinator | Reinoud Bokhorst | roadmin@astron.nl | ^ Coordinator | Reinoud Bokhorst | roadmin@astron.nl |
-^ Software Support | | softwaresupport@astron.nl | +^ Software Support | Arno Schoenmakers | softwaresupport@astron.nl | 
-^ Science, Operations and Support |  | sos@astron.nl | +^ Science, Operations and Support | Pietro Zucca | sos@astron.nl | 
-^ Observer | | observer@astron.nl |+^ Observer | Henk Mulder | observer@astron.nl |
  
  
-⇒ [[engineering:stop_day_procedures|Description of stopday procedures]] +⇒ [[engineering:stop_day_procedures|Description of stopday procedures]]\\ 
-⇒ [[https://docs.google.com/spreadsheets/d/e/2PACX-1vSEbxNss-nmOofKDXJRmgACwMDB9zeekBLRl39krswsVGIigfvzD_EdnlKJ_2TF-IGgoX2IXvc2YlXL/pubhtml|LOFAR Schedule cycle 10]]+⇒ [[https://docs.google.com/spreadsheets/d/e/2PACX-1vSEbxNss-nmOofKDXJRmgACwMDB9zeekBLRl39krswsVGIigfvzD_EdnlKJ_2TF-IGgoX2IXvc2YlXL/pubhtml|LOFAR Schedule cycle 10]]\\
 ⇒ The next stopday is scheduled for August 7. ⇒ The next stopday is scheduled for August 7.
 ===== Systems ===== ===== Systems =====
Line 18: Line 18:
 ==== Cobalt ==== ==== Cobalt ====
  
-  * Reboots and idrac reboots. (Hopko/Robin)+  * ✔ Reboots and idrac reboots. (Hopko)
  
  
 ==== CEP3 ==== ==== CEP3 ====
  
-  * Block access at 08:00 (Teun) +  * ✔ Block access at 08:00 (Teun) 
-  * All nodes: file system check and reboot. (Hopko, Robin)+  * ✔ All nodes: file system check and reboot. (Kees)
  
  
 ==== CEP4 ==== ==== CEP4 ====
  
-  * Reboot (Hopko/Robin+  * ✔ Reboot (Hopko) 
 +  * ✔ Recreate Docker thinpools on CPU nodes 
 +  * ✔ Recabling of Infiniband, details in Jira ticket 
 +  * Performance tests after recabling
  
 ==== LEXARS ==== ==== LEXARS ====
  
-  *  Reboot (Hopko/Robin)+  *  ✔ Reboot (Hopko/Robin)
  
  
Line 43: Line 45:
 ==== Central Services ==== ==== Central Services ====
    
-  * +  * ✔ Restart qpidd@ccu001 (ref. https://support.astron.nl/jira/browse/ROADMT-99) 
- +  * ✔ Test DMZ KVM Failover  (DMZ KVM Hypervisor hosts DMZ services (portal,dns server,smtp,proxy etc)) 
 +  * ✔ OS upgrade and reboot
 ==== LTA ==== ==== LTA ====
  
-  * Update and reboot (Reinoud) +  * ✔ Update and reboot (Reinoud) 
 +  * ✔ Migration of Oracle DB to new hardware (Andrey Tsyganov)
 ==== Aartfaac ==== ==== Aartfaac ====
  
-  * Check for broken disks **Fail**: ais007 has a degraded RAID1  !!+  * ✔ Check for broken disks **Fail**: ais007 had a degraded RAID1, but a controller firmware update helped.
  
  
Line 58: Line 60:
 ==== Core switches ==== ==== Core switches ====
  
-  * Warm reset PD0, RD0 and RD1 (Arjen)+  * ✔ Warm reset PD0, RD0 and RD1 (Arjen)
  
  
Line 76: Line 78:
   * none   * none
  
-==== CEP4 ====+==== LCU ====
  
-  * none+  * synchronize Python packages, see list in ticket 
 +  * ✔ umask change for foreign stations 
 + 
 +==== CEP4 ====
  
 +  * Rollout Docker images
 +  * ✘ SLURM upgrade  (postponed)
 ==== Aartfaac ==== ==== Aartfaac ====
  
Line 94: Line 101:
 ===== In the field ===== ===== In the field =====
  
-  * none+  * 
  
  
-==== Next stopday ==== 
  
-The next stopday is scheduled for August 7. 
  • Last modified: 2018-05-14 07:59
  • by Reinoud Bokhorst