Stop-day activities September 5, 2017


Coordinator Reinoud Bokhorst rbokhorst@astron.nl
Skype: astron_reinoud.bokhorst
Software Support Jorrit Schaap softwaresupport@astron.nl
Science, Operations and Support Matthijs van der Wiel sos@astron.nl
Observer Paul van Dijk observer@astron.nl

Planned end time: 15:00 LT (CET).

schedule

  • reboots and idrac reboots.
  • Restart the Infiniband Switches.
  • All nodes: file system check and reboot.
  • Upgrade IB driver cpu[01-40]
  • Performance tests
  • Reboot
  • ?
  • lcs116 upgrade & reboot
  • Reboot MAC/SAS prod. Consult Arno (Uptimes: mcu001=140 days, ccu001=140, scu001=112, smu001=140, sas001=78, sas003=78)
  • Reboot MAC/SAS test. Consult SDOS (Uptimes: mcu199=78, ccu199=112, scu199=19, smu199=140, sas099=106, sas199=196, ldb199=77)
  • NFS server lcs115 reboot (169 days up)
  • none
  • none
  • none