public:stopdayactivities_5sep2017

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:stopdayactivities_5sep2017 [2017-09-06 10:50] – [CEP4] Reinoud Bokhorstpublic:stopdayactivities_5sep2017 [2017-09-06 10:53] (current) – [Stop-day activities September 5, 2017] Reinoud Bokhorst
Line 10: Line 10:
 Planned end time: 15:00 LT (CET). Planned end time: 15:00 LT (CET).
  
-[[https://docs.google.com/spreadsheets/d/15a5H9IgXIditepSyM0mhElUP13ToRsbpJOZ3k_7A13U/edit?ts=59118d41#gid=847705076|schedule]]+[[https://docs.google.com/spreadsheets/d/15a5H9IgXIditepSyM0mhElUP13ToRsbpJOZ3k_7A13U/edit?ts=59118d41#gid=847705076|LOFAR Schedule]]
  
 ===== Systems ===== ===== Systems =====
Line 34: Line 34:
 ==== LEXARS ==== ==== LEXARS ====
  
-  * ✘ Reboot+  * ✘ Reboot  -> next stop-day
  
 ==== LCU ==== ==== LCU ====
Line 43: Line 43:
    
  
-  * ✘ lcs116 upgrade & reboot+  * ✘ lcs116 upgrade & reboot   -> next stop-day
   * √ Reboot MAC/SAS prod. Consult Arno (Uptimes: mcu001=140 days, ccu001=140,  scu001=112,  smu001=140, sas001=78, sas003=78)  -> done   * √ Reboot MAC/SAS prod. Consult Arno (Uptimes: mcu001=140 days, ccu001=140,  scu001=112,  smu001=140, sas001=78, sas003=78)  -> done
   * √ Reboot MAC/SAS test. Consult SDOS (Uptimes: mcu199=78, ccu199=112, scu199=19, smu199=140, sas099=106, sas199=196, ldb199=77)   * √ Reboot MAC/SAS test. Consult SDOS (Uptimes: mcu199=78, ccu199=112, scu199=19, smu199=140, sas099=106, sas199=196, ldb199=77)
-  * ✘ NFS server lcs115 reboot (169 days up)+  * ✘ NFS server lcs115 reboot (169 days up)  -> next stop-day
  
  
  • Last modified: 2017-09-06 10:50
  • by Reinoud Bokhorst