Stop-day activities November 7, 2017


Coordinator Reinoud Bokhorst rbokhorst@astron.nl
Software Support Arno Schoenmakers softwaresupport@astron.nl
Science, Operations and Support Vanessa Moss sos@astron.nl
Observer Henk Mulder observer@astron.nl

Planned end time: 15:00 LT (CET).

LOFAR Schedule

  • ✔ Reboots and idrac reboots.
  • ✔ Restart the Infiniband Switches
  • ✔ All nodes: file system check and reboot.
  • ✔ Update scipy on ALL nodes to 0.19.1
  • ✘ Fix hosts file (postponed to 5 December)
  • ✔/✘ Performance tests: ib perftest's, obdfilter-survey, lnet self-test, mdtest (partly done)
  • ✔ Reboot
  • ✘/✔ Reboots (only 7 were rebooted)
  • ✔ lcs116 upgrade & reboot
  • ✔ Upgrade KNMI portal and geo portal to Ubuntu 14
  • ✔ NFS server lcs115 reboot (169 days up)
  • ✔ warm reset of PD-0, RD-0 and RD-1. Scheduled for 11:00h
  • ✔ On LCU's: astropy-2.0.2, numpy-1.13.3, py-1.4.34, pytest-3.2.3
  • ✔ Activate LOFAR 3.0.0 (AS; Done)
  • ✔ Install losoto 1.0.1 (AS; Done)
  • ✔ Update scipy to 0.19.1 on all nodes (RB)
  • none
  • none
  • none
  • Fan replacement on containers core stations.