Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
| public:stopdayactivities_020719 [2019/06/25 07:41] – created klipic | public:stopdayactivities_020719 [2019/07/02 13:39] (current) – klipic | ||
|---|---|---|---|
| Line 4: | Line 4: | ||
| ^ Coordinator | Jasmin Klipic | roadmin@astron.nl | | ^ Coordinator | Jasmin Klipic | roadmin@astron.nl | | ||
| - | ^ Software Support | Royde Goei| goei@astron.nl | | + | ^ Software Support | Roy de Goei| goei@astron.nl | |
| ^ Science, Operations and Support | Emanulea Orru |orru@astron.nl | | ^ Science, Operations and Support | Emanulea Orru |orru@astron.nl | | ||
| - | ^ Observer | Richard Blaauw | + | ^ Observer | J.Sluman| observer@astron.nl | |
| ==== Actions ==== | ==== Actions ==== | ||
| - | * Operator will [[https:// | + | * ✔ Operator will [[https:// |
| - | * Update & reboot of all CentOS systems | + | * ✔ Update & reboot of all CentOS systems |
| - | * Reboot Ubunutu-14 systems (incl LCU's and both data writers) | + | * ✔ Reboot Ubunutu-14 systems (incl LCU's and both data writers) |
| - | * Test wop64 for WinCC compatibility, | + | * ✔ Test wop64 for WinCC compatibility, |
| - | * Jenkins: update plugins | + | * ✔ Jenkins: update plugins |
| - | * Reboot ALTA Production Storage and Nodes (count with 1h downtime) | + | * ✔ Reboot ALTA Production Storage and Nodes (count with 1h downtime) |
| + | * ✔ Reduce snmpd logging verbosity (change -Lsd to -LSwd in / | ||
| + | * ✔ adjust wcudata1/ | ||
| Note: | Note: | ||
| - | * Test update/ | + | * ✔ Test update/ |
| - | * Stop Virtualbox on alta2 before you start updating | + | * ✔ Stop Virtualbox on alta2 before you start updating |
| - | * Spacewalk VM will be updated before stop-day | + | * ✔ Spacewalk VM will be updated before stop-day |
| ==== Results ==== | ==== Results ==== | ||
| Line 27: | Line 30: | ||
| The results can be found in [[https:// | The results can be found in [[https:// | ||
| - | Have a look at the [[stopday_300419_review|minutes of the review meeting]] | + | Have a look at the [[stopday_300419_review|minutes of the previews |
| :!: The stop-days procedure can be found [[engineering: | :!: The stop-days procedure can be found [[engineering: | ||