| Line 6: | Line 6: | ||
| ^ Software Support | n/a | n/a | | ^ Software Support | n/a | n/a | | ||
| ^ Science, Operations and Support | Manu Orru |orru@astron.nl | | ^ Science, Operations and Support | Manu Orru |orru@astron.nl | | ||
| - | ^ Observer | ? | + | ^ Observer | Jurjen Sluman |
| + | |||
| + | ==== Actions ==== | ||
| + | |||
| + | * Operator will stop Apertif software before 08:00 LT | ||
| + | * Update & reboot of all listed WSRT and DWG systems (Walter and Teun)[[https:// | ||
| + | * ALTA systems update and reboot (Mike) | ||
| + | |||
| + | |||
| + | Note: | ||
| + | * Spacewalk VM (wop76) will be updated before stop-day (Walter) | ||
| + | * Perform update of test systems: dop375, dop445, dop818, wop78 before the stop-day (Walter) | ||
| + | * Perform update of test hypervisors: | ||
| + | * Stop Virtual-box on alta2 before starting update/ | ||
| + | |||
| + | |||
| + | |||
| + | |||
| + | ==== Stop Day Procedure ==== | ||
| + | |||
| + | |||
| + | |||
| + | :!: The stop-days procedure can be found [[engineering: | ||