Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| public:ldm:start [2013-01-30 14:12] – Antonis Polatidis | public:ldm:start [2015-10-06 12:24] (current) – removed Arno Schoenmakers | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== LOFAR Development Meetings ====== | ||
| - | The LOFAR Development meetings have the following goals: | ||
| - | * Prioritize the development work for the software development team at ASTRON based on input from the ASTRON MT, the ILT, the KSPs, Operations, and the Dev team itself. | ||
| - | * Identify resource problems and address these. | ||
| - | |||
| - | The meetings kicked of on Jan. 24th 2013, after the LCCG was abandoned. The current (Jan 2013) members are: | ||
| - | * Michael Wise (project scientist) | ||
| - | * Roberto Pizzo, Antonis Polatidis (LOFAR system/ | ||
| - | * George Heald (Imaging modes) | ||
| - | * Jason Hessels (Beamformed modes) | ||
| - | * Hanno Holties (LTA) | ||
| - | * Ronald Nijboer (BG, calibration and imaging) | ||
| - | * Arno Schoenmakers (scrum master dev. team) | ||
| - | |||
| - | ===== Meetings ===== | ||
| - | |||
| - | ^ Date ^ Notes ^ | ||
| - | | Jan 24 2013 | {{: | ||
| - | |||
| - | |||
| - | ===== Product Backlog ===== | ||
| - | |||
| - | Printout of product backlog - the online version can be found at: | ||
| - | |||
| - | |||
| - | https:// | ||
| - | |||
| - | Entries in boldface have been picked up in the current sprint (1.11, Jan 14 - Feb 4). | ||
| - | |||
| - | The remaining entries are to be considered and (re-)prioritised for the following sprints. | ||
| - | |||
| - | The un-numbered entries | ||
| - | |||
| - | |{{: | ||