public:ldm:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:ldm:start [2013-02-04 21:19] Antonis Polatidispublic:ldm:start [2015-10-06 12:24] (current) – removed Arno Schoenmakers
Line 1: Line 1:
-====== LOFAR Development Meetings ====== 
  
-The LOFAR Development meetings have the following goals: 
-  * Prioritize the development work for the software development team at ASTRON based on input from the ASTRON MT, the ILT, the KSPs, Operations, and the Dev team itself.  
-  * Identify resource problems and address these. 
- 
-The meetings kicked of on Jan. 24th 2013, after the LCCG was abandoned. The current (Jan 2013) members are: 
-  * Michael Wise (project scientist) 
-  * Roberto Pizzo, Antonis Polatidis (LOFAR system/operations) 
-  * George Heald (Imaging modes) 
-  * Jason Hessels (Beamformed modes) 
-  * Hanno Holties (LTA) 
-  * Ronald Nijboer (BG, calibration and imaging) 
-  * Arno Schoenmakers (scrum master dev. team) 
-  
-===== Meetings ===== 
- 
-^ Date ^ Notes ^  
-| Jan 24 2013 | {{:public:ldm:notes_from_lofar_development_meetings_dd_jan_24th_2013.pdf|Jan 24 2013}} | 
- 
- 
-===== Product Backlog =====  
- 
-Printout of product backlog - the online version can be found at:  
- 
- 
-https://docs.google.com/spreadsheet/ccc?key=0AmAVakIwFIaidGtEaXQzbFRabi1RNXVZVHd6aGotYWc#gid=0 
- 
-Entries in boldface have been picked up in the current sprint (1.11, Jan 14 - Feb 4). 
- 
-The remaining entries are to be considered and (re-)prioritised for the following sprints.  
- 
-The un-numbered entries  should receive estimates of the effort required/priority in subsequent meetings.  
- 
-|{{:public:ldm:product_backlog_-_30_jan_2013.pdf | Product Backlog, 30 Jan 2013}}| 
- 
- 
-Planning for Sprint 1.12 (Feb 5 - Feb 25) 
- 
-|{{:public:ldm:development_priorities_ss_sip.pdf | Items for the Standard Imaging Pipeline and for Science Support wishes (R. Pizzo - Feb 1)}} | 
-|{{:public:ldm:product_backlog_hah_20130203.xls|Items to prioritise (H. Holties, Feb 3)}}| 
  • Last modified: 2013-02-04 21:19
  • by Antonis Polatidis