Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| public:stopdayactivities_19mar2019 [2019-03-19 14:04] – [CEP3] grit | public:stopdayactivities_19mar2019 [2019-12-02 14:02] (current) – [Review meeting] Reinoud Bokhorst | ||
|---|---|---|---|
| Line 19: | Line 19: | ||
| ==== Cobalt ==== | ==== Cobalt ==== | ||
| - | * Reboots (Hopko) | + | * √ Reboots (Hopko) | 
| - | * restart IB Switch | + | * √ restart IB Switch | 
| Line 38: | Line 38: | ||
| ==== LEXARS ==== | ==== LEXARS ==== | ||
| - | * Reboots (Reinoud) | + | * √ Reboots (Reinoud) | 
| ==== LCU ==== | ==== LCU ==== | ||
| Line 58: | Line 58: | ||
| * √ OS upgrade and reboot (Teun) | * √ OS upgrade and reboot (Teun) | ||
| * √ (NFS server) Distro update to Ubuntu18 (Jasmin) | * √ (NFS server) Distro update to Ubuntu18 (Jasmin) | ||
| - | * ldb003: upgrade firmware, generate Dell report for broken network card (10G) (Jasmin) | + | * ✘ ldb003: upgrade firmware, generate Dell report for broken network card (10G) (Jasmin) | 
| ==== LTA ==== | ==== LTA ==== | ||
| - | * ✔ Update & reboot (Reinoud) | + | * √ Update & reboot (Reinoud) | 
| ==== Aartfaac ==== | ==== Aartfaac ==== | ||
| Line 83: | Line 83: | ||
| ==== MAC/SAS ==== | ==== MAC/SAS ==== | ||
| - | * Updating SASGateway code and configuration on MCU001 | + | * ✘ Updating SASGateway code and configuration on MCU001 | 
| - | * Updating FeedbackService code and configuration on MCU001 | + | * ✘ Updating FeedbackService code and configuration on MCU001 | 
| - | * Updating MACScheduler code and configuration on MCU001 | + | * ✘ Updating MACScheduler code and configuration on MCU001 | 
| - | + | * ✘ Updating SASGateway code and configuration on CCU001 | |
| - | * Updating SASGateway code and configuration on CCU001 | + | * ✘ Updating LCU code and configuration on available stations (at minimum we need the configurations in place) | 
| + | * ✔ Create database roles for OTDB (Postgres) and change ACL. (Reinoud) | ||
| - | * Updating LCU code and configuration on available stations (at minimum we need the configurations in place) | + | The users were created but the code could not be rolled out because more code changes are needed. | 
| - | * Create database roles for OTDB (Postgres) and change ACL. (Reinoud) | + | If times allows us to make those changes it will be released in 3.3 otherwise some code will need to be reverted | 
| ==== CEP3 ==== | ==== CEP3 ==== | ||
| Line 117: | Line 118: | ||
| ==== DWG Lofar Systems ==== | ==== DWG Lofar Systems ==== | ||
| - | * Update & Reboot (Jasmin) | + | * √ Update & Reboot (Jasmin) | 
| - | ==== Review meeting ==== | ||
| - | * - | ||