Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
cep3:start [2015-07-01 12:54] – [CEP3 Science Support documentation] Marco Iacobelli | cep3:start [2021-02-19 14:21] (current) – Marco Iacobelli | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== CEP3 Cluster ====== | ====== CEP3 Cluster ====== | ||
- | This is the entry point for all CEP3 related information. CEP3 is the new processing cluster that will be configured as a managed cluster. Users will be allotted time through a time allocation committee and will have restricted access for a limited amount of time. | + | This is the entry point for all CEP3 related information. CEP3 is a processing cluster that will be configured as a managed cluster. |
- | ===== CEP3 setup and configuration | + | ====== CEP3 usage policy ====== |
- | | + | **The use of CEP3 cluster is allocated by the LOFAR Programme Committee and the ILT director during the regular proposal evaluation stages, or under Director' |
- | * [[cep3: | + | |
- | ===== CEP3 Science Support documentation ===== | + | **To have access to CEP3 a formal request must be submitted via the ticketing system at ** **[[https:// |
- | | + | * **A brief explanation of why access |
- | * [[cep3: | + | * **Project to be worked |
- | * [[cep3:scsup_data_transfers| Data transfers on CEP3]] | + | * **Description of the kind of processing for which CEP3 access is requested** |
- | * [[cep3:scsup_account_management| Remove users/accounts from Slurm] | + | * **List of collaborators (if any) who should also have access** |
- | | + | * **General description of the data to be processed (e.g. data size)** |
- | ===== CEP3 User documentation ===== | + | * **Estimated processing time required** |
+ | **Users awarded with access to CEP3 will be able to access the cluster for a limited period of time (__8 weeks by default__). The awarded period starts following the timeline communicated to the user via the SDCO notification and available at [[:cep3:earlyaccess|]]. At the beginning of a Cycle, users requesting CEP3 processing time in their observing proposals can derive this timeline by checking the observing schedule, which is available | ||
- | | + | **__After the granted period |
- | | + | |
- | * [[cep3: | + | |
- | * [[cep3: | + | |
- | * [[cep3: | + | |
+ | **Extensions to the __default 8-weeks__ | ||
- | ===== CEP3 Usage Schedule | + | ===== CEP3 User documentation |
- | * [[cep3:earlyaccess | + | * [[:cep3:access|How to obtain access to CEP3 and its nodes]] |
+ | * [[: | ||
+ | * [[: | ||
+ | * [[: | ||
+ | * [[:cep3:access# | ||
+ | |||
+ | ===== CEP3 Usage Schedule ===== | ||
+ | * [[: | ||
+ | * [[: | ||
- | ===== CEP3 Testing | + | ===== CEP3 Setup, configuration and internals |
- | * [[cep3:earlyaccesstests|CEP3 early access testing setup]] | + | * [[:cep3:systeminternalsetup|Setup and configuration of CEP3 cluster (internal use)]] |
- | * [[cep3:earlyaccessnotes|CEP3 early access User and Usage Notes]] | + | |
- | * [[cep3: | + | |
- | ===== Meeting notes ===== | + | |
- | * [[cep3: | ||
- | * [[cep3: | ||
- | * [[cep3: | ||
- | * [[cep3: | ||