public:stopdayactivities_24sep2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revisionBoth sides next revision
public:stopdayactivities_24sep2019 [2019-09-12 06:37] – [Central Services lcs020 .. lcs030] Reinoud Bokhorstpublic:stopdayactivities_24sep2019 [2019-09-19 14:36] – [Core switches] Jasmin Klipic
Line 2: Line 2:
  
 ^Coordinator|Jasmin Klipic|klipic@astron.nl| ^Coordinator|Jasmin Klipic|klipic@astron.nl|
-^Software Support|Mattia Mancini|mancini@astron.nl|+^Software Support|Jorrit Schaap|schaap@astron.nl|
 ^Science, Operations and Support|Bernard Asabere|asabere@astron.nl| ^Science, Operations and Support|Bernard Asabere|asabere@astron.nl|
 ^Observer|Henk Mulder|observer@astron.nl| ^Observer|Henk Mulder|observer@astron.nl|
  
 ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\ ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\
-⇒ [[https://docs.google.com/spreadsheets/d/1sjcDGm0yIKWaud_1KN1iV27VdFR15MWkZpDNTzlX5L4/edit?ts=5bdc491a#gid=274896772|LOFAR Schedule cycle 11]]+⇒ [[https://docs.google.com/spreadsheets/d/1WwH_cdZFH8CGSAM5SDokb-rZmm6G9mKz8LcTQZUc5fY/edit?ts=5d00b1e6#gid=0|LOFAR Schedule cycle 1]]2
  
 ===== Systems ===== ===== Systems =====
  
-==== Cobalt ==== +====   ====
- +
-  * Reboots (Hopko) +
-  * restart IB Switch+
  
 ==== Cobalt2 ==== ==== Cobalt2 ====
  
-  * Reboots (Hopko)+  * Reboots (ROadmin) 
 +  * restart IB Switch 
 +  * recabling 10G interfaces (Arjen K (vlans??)JDM) 
  
 ==== CEP3 ==== ==== CEP3 ====
Line 36: Line 36:
 ==== LCU ==== ==== LCU ====
  
-  * Upgrade to CentOS 7.6 (Jasmin)+  * Upgrade to CentOS 7.6 (Jasmin) wait for confirmation
   * reboot (Jasmin)   * reboot (Jasmin)
 +
  
 ==== Portals ==== ==== Portals ====
Line 47: Line 48:
   * OS upgrade and reboot (Teun)   * OS upgrade and reboot (Teun)
   * Switch-over ldb003 / lcs119 (dbsrv1)   * Switch-over ldb003 / lcs119 (dbsrv1)
- 
  
 ==== LTA ==== ==== LTA ====
Line 59: Line 59:
 ==== Core switches ==== ==== Core switches ====
  
-  * Warm reset PD0. RD0, RD1+  * Warm reset PD0. RD0, RD1 (Arjen K 3 p.m) 
  
 ==== DWG Lofar Systems ==== ==== DWG Lofar Systems ====
Line 100: Line 101:
  
 ====   ==== ====   ====
 +
 +\\
  
  
  • Last modified: 2019-09-25 08:02
  • by Reinoud Bokhorst