public:stopdayactivities_24sep2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revisionBoth sides next revision
public:stopdayactivities_24sep2019 [2019-09-19 14:21] – [LCU] Jasmin Klipicpublic:stopdayactivities_24sep2019 [2019-09-19 14:57] – [Stop-day activities September 24-25, 2019] Jasmin Klipic
Line 4: Line 4:
 ^Software Support|Jorrit Schaap|schaap@astron.nl| ^Software Support|Jorrit Schaap|schaap@astron.nl|
 ^Science, Operations and Support|Bernard Asabere|asabere@astron.nl| ^Science, Operations and Support|Bernard Asabere|asabere@astron.nl|
-^Observer|Henk Mulder|observer@astron.nl|+^Observer|Paul V. Dijk|observer@astron.nl|
  
 ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\ ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\
 ⇒ [[https://docs.google.com/spreadsheets/d/1WwH_cdZFH8CGSAM5SDokb-rZmm6G9mKz8LcTQZUc5fY/edit?ts=5d00b1e6#gid=0|LOFAR Schedule cycle 1]]2 ⇒ [[https://docs.google.com/spreadsheets/d/1WwH_cdZFH8CGSAM5SDokb-rZmm6G9mKz8LcTQZUc5fY/edit?ts=5d00b1e6#gid=0|LOFAR Schedule cycle 1]]2
 +
 +\\
 +
  
 ===== Systems ===== ===== Systems =====
Line 17: Line 20:
   * Reboots (ROadmin)   * Reboots (ROadmin)
   * restart IB Switch   * restart IB Switch
 +  * recabling 10G interfaces (Arjen K (vlans??)JDM)
 +
  
 ==== CEP3 ==== ==== CEP3 ====
Line 25: Line 30:
 ==== CEP4 ==== ==== CEP4 ====
  
-  * Reboots +  * reconfigure SLURM (jasmin) 
-  * restart IB Switches+  * Reboots (jasmin) 
 +  * restart IB Switches (skipped) 
  
 ==== LEXARS ==== ==== LEXARS ====
Line 57: Line 64:
 ==== Core switches ==== ==== Core switches ====
  
-  * Warm reset PD0. RD0, RD1+  * Warm reset PD0. RD0, RD1 (Arjen K 3 p.m) 
  
 ==== DWG Lofar Systems ==== ==== DWG Lofar Systems ====
  • Last modified: 2019-09-25 08:02
  • by Reinoud Bokhorst