Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:stopdayactivities_24sep2019 [2019-09-12 06:37]
Reinoud Bokhorst [Central Services lcs020 .. lcs030]
public:stopdayactivities_24sep2019 [2019-09-19 14:57] (current)
Jasmin Klipic [Stop-day activities September 24-25, 2019]
Line 2: Line 2:
  
 ^Coordinator|Jasmin Klipic|klipic@astron.nl| ^Coordinator|Jasmin Klipic|klipic@astron.nl|
-^Software Support|Mattia Mancini|mancini@astron.nl|+^Software Support|Jorrit Schaap|schaap@astron.nl|
 ^Science, Operations and Support|Bernard Asabere|asabere@astron.nl| ^Science, Operations and Support|Bernard Asabere|asabere@astron.nl|
-^Observer|Henk Mulder|observer@astron.nl|+^Observer|Paul V. Dijk|observer@astron.nl|
  
 ⇒ [[:​engineering:​stop_day_procedures|Description of stopday procedures]]\\ ⇒ [[:​engineering:​stop_day_procedures|Description of stopday procedures]]\\
-⇒ [[https://​docs.google.com/​spreadsheets/​d/​1sjcDGm0yIKWaud_1KN1iV27VdFR15MWkZpDNTzlX5L4/edit?ts=5bdc491a#gid=274896772|LOFAR Schedule cycle 11]]+⇒ [[https://​docs.google.com/​spreadsheets/​d/​1WwH_cdZFH8CGSAM5SDokb-rZmm6G9mKz8LcTQZUc5fY/edit?ts=5d00b1e6#gid=0|LOFAR Schedule cycle 1]]2
  
-===== Systems =====+\\
  
-==== Cobalt ==== 
  
-  * Reboots (Hopko) +===== Systems ===== 
-  * restart IB Switch+ 
 +====   ====
  
 ==== Cobalt2 ==== ==== Cobalt2 ====
  
-  * Reboots (Hopko)+  * Reboots (ROadmin) 
 +  * restart IB Switch 
 +  * recabling 10G interfaces (Arjen K (vlans??​)JDM) 
  
 ==== CEP3 ==== ==== CEP3 ====
Line 27: Line 30:
 ==== CEP4 ==== ==== CEP4 ====
  
-  * Reboots +  ​* reconfigure SLURM (jasmin) 
-  * restart IB Switches+  ​* Reboots ​(jasmin) 
 +  * restart IB Switches ​(skipped) 
  
 ==== LEXARS ==== ==== LEXARS ====
Line 36: Line 41:
 ==== LCU ==== ==== LCU ====
  
-  * Upgrade to CentOS 7.6 (Jasmin)+  * Upgrade to CentOS 7.6 (Jasmin) ​wait for confirmation
   * reboot (Jasmin)   * reboot (Jasmin)
 +
  
 ==== Portals ==== ==== Portals ====
Line 47: Line 53:
   * OS upgrade and reboot (Teun)   * OS upgrade and reboot (Teun)
   * Switch-over ldb003 / lcs119 (dbsrv1)   * Switch-over ldb003 / lcs119 (dbsrv1)
- 
  
 ==== LTA ==== ==== LTA ====
Line 59: Line 64:
 ==== Core switches ==== ==== Core switches ====
  
-  * Warm reset PD0. RD0, RD1+  * Warm reset PD0. RD0, RD1 (Arjen K 3 p.m) 
  
 ==== DWG Lofar Systems ==== ==== DWG Lofar Systems ====
Line 100: Line 106:
  
 ====   ==== ====   ====
 +
 +\\
  
  
  • Last modified: 2019-09-12 06:37
  • by Reinoud Bokhorst