public:stopdayactivities_9jul2019

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revisionBoth sides next revision
public:stopdayactivities_9jul2019 [2019-07-08 14:18] – [LEXARS] Reinoud Bokhorstpublic:stopdayactivities_9jul2019 [2019-07-09 11:37] – [DWG Lofar Systems] Reinoud Bokhorst
Line 8: Line 8:
 ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\ ⇒ [[:engineering:stop_day_procedures|Description of stopday procedures]]\\
 ⇒ [[https://docs.google.com/spreadsheets/d/1sjcDGm0yIKWaud_1KN1iV27VdFR15MWkZpDNTzlX5L4/edit?ts=5bdc491a#gid=274896772|LOFAR Schedule cycle 11]] ⇒ [[https://docs.google.com/spreadsheets/d/1sjcDGm0yIKWaud_1KN1iV27VdFR15MWkZpDNTzlX5L4/edit?ts=5bdc491a#gid=274896772|LOFAR Schedule cycle 11]]
- 
-\\ 
- 
  
 ===== Systems ===== ===== Systems =====
Line 16: Line 13:
 ==== Cobalt ==== ==== Cobalt ====
  
-  * Reboots (Hopko) +  * ✔ Reboots (Hopko) 
-  * restart IB Switch (CANCELED) +  * ✘ restart IB Switch (CANCELED)
  
 ==== Cobalt2 ==== ==== Cobalt2 ====
  
-  * Upgrade (roadmin) +  * ✔ Upgrade (roadmin) 
-  * Reboots (roadmin) +  * ✔ Reboots (roadmin)
  
 ==== CEP3 ==== ==== CEP3 ====
  
-  * Block access at 08:00 (Reinoud) +  * ✔ Block access at 08:00 (Reinoud) 
-  * Reboots (Kees)+  * ✔ Reboots (Kees)
  
  
 ==== CEP4 ==== ==== CEP4 ====
  
-  * Reboots (CANCELED) +  * ✘ Reboots (CANCELED) 
-  * restart IB Switches (CANCELED) +  * ✘ restart IB Switches (CANCELED) 
-  * Replace memory DIMM cpu49 (Hopko) +  * ✔ Replace memory DIMM cpu49 (Hopko)
  
 ==== LEXARS ==== ==== LEXARS ====
  
-  * Reboots (Hopko) +  * ✘ Reboots (CANCELED)
  
 ==== LCU ==== ==== LCU ====
  
-  * reboot 08:30h (Reinoud) +  * ✔ reboot 08:30h (Reinoud)
  
 ==== Portals ==== ==== Portals ====
  
-  * Update & reboot (Jasmin)+  * ✔ Update & reboot (Jasmin)
  
 ==== Central Services lcs020 .. lcs030 ==== ==== Central Services lcs020 .. lcs030 ====
  
-  * OS upgrade and reboot +  * ✔ OS upgrade and reboot (Jasmin) 
-  * Switch primary/slave roles of Postgres cluster dbsrv1 (ldb003, lcs119) +  * ✔ Switch primary/slave roles of Postgres cluster dbsrv1 (ldb003, lcs119) (Reinoud
-  * Remove lofarsys from NIS groups (lofarsys is/should be local account) +  * ✔ Remove lofarsys from NIS groups 'developer' and 'pipeline' (lofarsys is/should be local account) (Reinoud)
- +
- +
-==== Other Central Services ====+
  
-  * OS upgrade and reboot 
  
 ==== LTA ==== ==== LTA ====
  
-  * Update & reboot (Reinoud)+  * ✔ Update & reboot (Reinoud)
  
 ==== Aartfaac ==== ==== Aartfaac ====
Line 74: Line 62:
 ==== Core switches ==== ==== Core switches ====
  
-  * Warm reset PD0. RD0, RD1 (Arjen)+  * ✘ Warm reset PD0. RD0, RD1 (CANCELED) 
 + 
 +====   ==== 
 + 
 +==== DWG Lofar Systems ==== 
 + 
 +  * ✔ Update & Reboot (Reinoud)
  
  
Line 111: Line 105:
   * none   * none
  
-==== DWG Lofar Systems ==== +====   ====
- +
-  * Update & Reboot (Jasmin)+
  
 \\ \\
  
  
  • Last modified: 2019-07-09 11:39
  • by Reinoud Bokhorst