AAVP 2011:

Taking the AA programme into SKA Pre-Construction

12-16 December, 2011 - ASTRON, Dwingeloo

Program

Preliminary schedule

It would seem appropriate to start with two days of technical meeting with defined leaders to agree the performance of the subsystems. There should be enough time to have a report for presentation at a plenary meeting.


There then follows a science and technical conference to review the Science, DRM, requirements and implementation discussion.

The programma can be found here (as PDF)

 

Documents of this workshop can be found here.