Daily Image

04-01-2016
PreviousNext
Click here or on the picture for a full size image.

APERTIF-6 FrontEnds

Submitter: Raymond van den Brink
Description: At the end of October the APERTIF LNAs came in after production and testing at Variass. In November members of the APERTIF team installed these LNAs with Vivaldis in the housing and carrier produced by ITEQ.
Cabling was assembled as well and after testing members of the radio observatory installed the PAF FrontEnds of APERTIF in RT2, RT4, RT5, RT8, RT9 and RTA.
Six PAFs are installed now, the APERTIF team is doing a wonderfull job!

Copyright: APERTIF
 
  Follow us on Twitter
Please feel free to submit an image using the Submit page.