public:stopdayactivities_6dec2016

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revisionBoth sides next revision
public:stopdayactivities_6dec2016 [2016-11-29 13:06] – [Central] gritpublic:stopdayactivities_6dec2016 [2016-12-05 14:57] – [LCU replacement] grit
Line 9: Line 9:
   * Swap ports of Cobalt node 8 to address the UDP packet loss (Arjen)   * Swap ports of Cobalt node 8 to address the UDP packet loss (Arjen)
   * Cabinet D8 need to power down to replace a power meter at 10:00 (Kees) \\ (affected systems: lcs116, lcs117, mgt001, all portal virtual machines: agro, cosmic, dep1, dep2, geo, geolofar, knmi, nap, portal, smtp)   * Cabinet D8 need to power down to replace a power meter at 10:00 (Kees) \\ (affected systems: lcs116, lcs117, mgt001, all portal virtual machines: agro, cosmic, dep1, dep2, geo, geolofar, knmi, nap, portal, smtp)
 +  * Cabinet A1 (Dragnet) needs to power down to replace a power meter
 +  * All NL LCU's need to reload ntpd using Ansible. It will change the priority of ntpd to -6.
  
  
 ==== LCU replacement ==== ==== LCU replacement ====
  
-The following International stations will replace their LCUs: +  * All (!) International stations will replace their LCUs. Uninterrupted network access is vital. 
-  DE603+ 
 +**The international LCU's will be switched off at 07:50 LT** 
 + 
 +Note: The LCU in the Concentrator Node will be replaced Jan 32017
 ===== Systems ===== ===== Systems =====
  
  • Last modified: 2017-03-08 15:27
  • by 127.0.0.1