public:meetings:2010_04_11_ilto

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:meetings:2010_04_11_ilto [2011-05-20 12:42] Menno Nordenpublic:meetings:2010_04_11_ilto [2017-03-08 15:27] (current) – external edit 127.0.0.1
Line 13: Line 13:
 All but the Onsala stations have been built. The LBAs at the Jülich station have been installed late in April 2011. All but the Onsala stations have been built. The LBAs at the Jülich station have been installed late in April 2011.
  
-sixth German station will be built near Bieleveldprobably in 2012.+Funding for sixth German station near Bieleveld is being sought. If the funding comes through the station will probably be build in 2012.
  
 eVLBI will require approximately 4 Gb/s bandwidth. That will not leave sufficient bandwidth for two international stations to share the same 10 Gb/s fibre to Groningen. Changing the number of beamlets on the fly will not reduce bandwidth: it merely pads the unused channels with zeroes. eVLBI will require approximately 4 Gb/s bandwidth. That will not leave sufficient bandwidth for two international stations to share the same 10 Gb/s fibre to Groningen. Changing the number of beamlets on the fly will not reduce bandwidth: it merely pads the unused channels with zeroes.
  • Last modified: 2011-05-20 12:42
  • by Menno Norden