Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
public:stopdayactivities_6dec2016 [2016-12-02 07:34] – [LCU replacement] grit | public:stopdayactivities_6dec2016 [2017-03-08 15:27] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 10: | Line 10: | ||
* Cabinet D8 need to power down to replace a power meter at 10:00 (Kees) \\ (affected systems: lcs116, lcs117, mgt001, all portal virtual machines: agro, cosmic, dep1, dep2, geo, geolofar, knmi, nap, portal, smtp) | * Cabinet D8 need to power down to replace a power meter at 10:00 (Kees) \\ (affected systems: lcs116, lcs117, mgt001, all portal virtual machines: agro, cosmic, dep1, dep2, geo, geolofar, knmi, nap, portal, smtp) | ||
* Cabinet A1 (Dragnet) needs to power down to replace a power meter | * Cabinet A1 (Dragnet) needs to power down to replace a power meter | ||
+ | * All NL LCU's need to reload ntpd using Ansible. It will change the priority of ntpd to -6. | ||
==== LCU replacement ==== | ==== LCU replacement ==== | ||
- | The following | + | * All (!) International stations will replace their LCUs. Uninterrupted network access is vital. |
- | * DE603, | + | |
+ | **The international LCU's will be switched off at 08:15 LT** | ||
Note: The LCU in the Concentrator Node will be replaced Jan 3, 2017 | Note: The LCU in the Concentrator Node will be replaced Jan 3, 2017 |