public:stopdayactivities_6dec2016

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:stopdayactivities_6dec2016 [2016-12-02 07:34] – [LCU replacement] gritpublic:stopdayactivities_6dec2016 [2017-03-08 15:27] (current) – external edit 127.0.0.1
Line 10: Line 10:
   * Cabinet D8 need to power down to replace a power meter at 10:00 (Kees) \\ (affected systems: lcs116, lcs117, mgt001, all portal virtual machines: agro, cosmic, dep1, dep2, geo, geolofar, knmi, nap, portal, smtp)   * Cabinet D8 need to power down to replace a power meter at 10:00 (Kees) \\ (affected systems: lcs116, lcs117, mgt001, all portal virtual machines: agro, cosmic, dep1, dep2, geo, geolofar, knmi, nap, portal, smtp)
   * Cabinet A1 (Dragnet) needs to power down to replace a power meter   * Cabinet A1 (Dragnet) needs to power down to replace a power meter
 +  * All NL LCU's need to reload ntpd using Ansible. It will change the priority of ntpd to -6.
  
  
 ==== LCU replacement ==== ==== LCU replacement ====
  
-The following International stations will replace their LCUs: +  * All (!) International stations will replace their LCUs. Uninterrupted network access is vital. 
-  DE603, + 
 +**The international LCU's will be switched off at 08:15 LT**
  
 Note: The LCU in the Concentrator Node will be replaced Jan 3, 2017 Note: The LCU in the Concentrator Node will be replaced Jan 3, 2017
  • Last modified: 2016-12-02 07:34
  • by grit