public:stopdayactivities_1nov2016

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revisionBoth sides next revision
public:stopdayactivities_1nov2016 [2016-10-31 07:56] – [Stop-day activities Nov 1, 2016] gritpublic:stopdayactivities_1nov2016 [2016-11-01 09:52] – [Network] grit
Line 3: Line 3:
 Coordinated by Teun. Prefered end time 15:00. Coordinated by Teun. Prefered end time 15:00.
  
 +The order of the stop-day will be Cobalt, CEP4, CEP3.
 +This way we have time to test with new MCU & CCU hosts (Arno)
 ==== Network ==== ==== Network ====
  
-Arjen will swap ports of Cobalt node 8 to address the UDP packet loss.+(Arjen will swap ports of Cobalt node 8 to address the UDP packet loss
 + 
 +Postponed. This requires test-time. We want to have mcu002 & ccu002 first.
 ===== Systems ===== ===== Systems =====
  
  • Last modified: 2017-03-08 15:27
  • by 127.0.0.1