Show pageOld revisionsBacklinksExport to PDFBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. ====== Stop-day activities Jan 3, 2017 ====== Coordinated by Teun. Prefered end time 15:00. The order of the stop-day will be Cobalt, CEP4, CEP3. Jorrit will assist for Software Support. ==== Network ==== (Arjen is not in) ===== Systems ===== * Remove old machines * Updates and reboots ==== cep2 ==== * Shutdown for users, start of wipe of disks * Power down all nodes except lhn001 * ==== Cobalt ==== * Reset idrac * Reboot ==== CEP3 ==== * Do a filesystem check on /data of lof001-022 (Done by Hopko) * Reboots ==== CEP4 ==== * nop ===== Software updates ===== ==== MAC/SAS ==== (Arno is not in) ==== CEP3 ==== * none ==== CEP4 ==== * none ==== Aartaac ==== * ais002 remove 1x10G, add 1x 1G * ais007 new disk, reinstall OS CKG Edit Last modified: 2017-03-08 15:27by 127.0.0.1 Log In