public:stopdayactivities_6dec2016

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:stopdayactivities_6dec2016 [2016-11-29 08:56] – [CEP4] gritpublic:stopdayactivities_6dec2016 [2017-03-08 15:27] (current) – external edit 127.0.0.1
Line 8: Line 8:
  
   * Swap ports of Cobalt node 8 to address the UDP packet loss (Arjen)   * Swap ports of Cobalt node 8 to address the UDP packet loss (Arjen)
-  * Cabinet D3 need to power down to replace a power meter at 10:00 (Kees)+  * Cabinet D8 need to power down to replace a power meter at 10:00 (Kees) \\ (affected systems: lcs116, lcs117, mgt001, all portal virtual machines: agro, cosmic, dep1, dep2, geo, geolofar, knmi, nap, portal, smtp) 
 +  * Cabinet A1 (Dragnet) needs to power down to replace a power meter 
 +  * All NL LCU's need to reload ntpd using Ansible. It will change the priority of ntpd to -6. 
  
 ==== LCU replacement ==== ==== LCU replacement ====
  
-The following International stations will replace their LCUs: +  * All (!) International stations will replace their LCUs. Uninterrupted network access is vital. 
-  DE603+ 
 +**The international LCU's will be switched off at 08:15 LT** 
 + 
 +Note: The LCU in the Concentrator Node will be replaced Jan 32017
 ===== Systems ===== ===== Systems =====
  
 ==== Central ==== ==== Central ====
  
-  * Update spacewalk host (make inage first!)+  * Update spacewalk host (make image first!)
 ==== cep2 ==== ==== cep2 ====
   * Reboot of all nodes   * Reboot of all nodes
Line 31: Line 37:
   * Do a filesystem check on /data of lof001-022 (Done by Robin)   * Do a filesystem check on /data of lof001-022 (Done by Robin)
   * Reboots   * Reboots
 +  * Reset idrac
  
  
  • Last modified: 2016-11-29 08:56
  • by grit