Stop-day activities Dec 6, 2016

Coordinated by Reinoud. Prefered end time 15:00.

The order of the stop-day will be Cobalt, CEP4, CEP3.

  • Swap ports of Cobalt node 8 to address the UDP packet loss (Arjen)
  • Cabinet D3 need to power down to replace a power meter at 10:00 (Kees)

The following International stations will replace their LCUs:

  • DE603,
  • Update spacewalk host (make inage first!)
  • Reboot of all nodes
  • Reset idrac
  • Reboot
  • Do a filesystem check on /data of lof001-022 (Done by Robin)
  • Reboots
  • ?
  • dop215 (Northstar) reboot
  • dop216 (Proposal) reboot
  • dop303 (Lofar MoM) reboot
  • dop293 (MySQL database) reboot
  • none
  • none
  • Make LOFAR Release 2.19 default version
  • Make WSClean 2.0 the default version
  • none