This is an old revision of the document!
Stop-day activities December 4-5, 2018
Coordinator | Teun Grit | roadmin@astron.nl |
---|---|---|
Software Support | softwaresupport@astron.nl | |
Science, Operations and Support | sos@astron.nl | |
Observer | observer@astron.nl |
⇒ Description of stopday procedures
⇒ LOFAR Schedule cycle 11
Systems
Cobalt
- Reboots and idrac reboots. (Hopko)
CEP3
- Block access at 08:00 (Teun)
- Repair memory bank of lof021 See ticket CIT-25
CEP4
- Switch IPoIB to connected mode on head and gpu nodes, see https://support.astron.nl/jira/browse/ROADMT-186
LEXARS
- Powerdrain of iDracs
- Update iDrac firmware
LCU
- Test reboot script on 1 LCU
Portals
- Update & reboot
Central Services lcs020 .. lcs030
- OS upgrade and reboot
Other Central Services
- OS upgrade and reboot
- Remove Zabbix-agent version 2.2 from scu001
LTA
- None
Aartfaac
- None
Core switches
- Warm reset 11:00h (Arjen)
Software updates
MoM and related
- none
MAC/SAS
- none
CEP3
- Debug slurm lost reservations
LCU
- None
CEP4
- Slurm update
Aartfaac
- None
COBALT
- none
LTA
- none