Stop-day activities December 4-5, 2018
Coordinator | Teun Grit | roadmin@astron.nl |
---|---|---|
Software Support | Arno Schoenmakers | softwaresupport@astron.nl |
Science, Operations and Support | Matthijs, Pietro | sos@astron.nl |
Observer | Henk Mulder | observer@astron.nl |
⇒ Description of stopday procedures
⇒ LOFAR Schedule cycle 11
⇒ Stop-day progress sheet (2 tabs!)
Systems
Cobalt
- Reboots and idrac reboots. (Hopko)
CEP3
- Block access at 08:00 (Teun)
- Repair memory bank of lof021 See ticket CIT-25
- No further update (Slurm? Python3?)
CEP4
- Switch IPoIB to connected mode on head and gpu nodes, see https://support.astron.nl/jira/browse/ROADMT-186
- The Slurm disk performance tests are planned for after the stopday. (Volume now is 75%)
LEXARS
- Powerdrain of iDracs (Hopko/Robin)
- Update iDrac firmware (Hopko/Robin)
- The lexars stay on CentOS7.2
- Some investigation is needed on the iDrac's (Hopko)
LCU
- Test reboot script on 1 LCU
- Some remote stations need reboot
- Install WinCC 3.16 on 1 LCU. Jasmin: Can't be done on CentOS7.2. We need a 7.5 system. There is a spare LCU available in the Dwnigeloo digital lab (RS511). In the end we need WinCC 3.16 on all LCU's someday.
Portals
- Update & reboot
- Check High Availability of portal2
Central Services lcs020 .. lcs030
- OS upgrade and reboot
- Start Postgres replication ldb003 → lcs119
- Plug in new harddisks for ldb003 (leave unconfigured)
Other Central Services
- OS upgrade and reboot
- Remove Zabbix-agent version 2.2 from scu001
LTA
- None
Aartfaac
- Connect IB switch to CEP4 spine switches, instead of the Cobalt switch. The cables are already in. (Hopko)
Core switches
- Warm reset 11:00h (Arjen)
Software updates
MoM and related
- none
MAC/SAS
- none
CEP3
- Debug slurm lost reservations (Reinoud)
LCU
- None
CEP4
- Slurm update
Aartfaac
- None
COBALT
- none
LTA
- none