This is an old revision of the document!
Stop-day activities February 6-7, 2018
Coordinator | Reinoud Bokhorst | roadmin@astron.nl |
---|---|---|
Software Support | softwaresupport@astron.nl | |
Science, Operations and Support | sos@astron.nl | |
Observer | observer@astron.nl |
Systems
Cobalt
- Reboots and idrac reboots. (Hopko/Robin)
- Restart the Infiniband Switches (Hopko/Robin)
- Install new iDrac firmware BIOS and Netwerk firmware
CEP3
- All nodes: file system check and reboot. (Hopko, Robin)
CEP4
- Fix hosts file (when properly prepared) (Hopko)
- Performance tests: ib perftest's, obdfilter-survey, lnet self-test, mdtest (partly done) (Reinoud)
- Reinstall cpu49, look at cpu27 (Hopko/Robin)
LEXARS
- no actions
LCU
- Reboots all done (Teun)
Central Services
- none
LTA
- Update OS (Reinoud)
Aartfaac
- none
Core switches
- none
Software updates
MAC/SAS
- none
CEP3
- none
CEP4
- none
Aartfaac
- none
COBALT
- none
LTA
- Update AstroWise common (Reinoud)
In the field
- none