Stop-day activities Dec 6, 2016

Coordinated by Reinoud. Prefered end time 15:00.

The order of the stop-day will be Cobalt, CEP4, CEP3.

  • Arjen will swap ports of Cobalt node 8 to address the UDP packet loss
  • Cabinet D3 need topower down to replace a power meter.

The following International stations will replace their LCUs:

  • DE603,
  • Update spacewalk host (make inage first!)
  • Reboot of all nodes
  • Reset idrac
  • Reboot
  • Do a filesystem check on /data of lof001-022 (Done by Robin)
  • Reboots
  • ?
  • none
  • none
  • Make LOFAR Release 2.19 default version
  • Make WSClean 2.0 the default version
  • none