This is an old revision of the document!
Stop-day activities August 7-8, 2018
Coordinator | Teun Grit | roadmin@astron.nl |
---|---|---|
Software Support | Adriaan Renting | softwaresupport@astron.nl |
Science, Operations and Support | Thomas Franzen | sos@astron.nl |
Observer | Richard Blaauw | observer@astron.nl |
⇒ Description of stopday procedures
⇒ LOFAR Schedule cycle 10
⇒ The next stopdays are scheduled for October 2-3.
Systems
Cobalt
- Reboots and idrac reboots. (Hopko)
CEP3
- Block access at 08:00 (Teun)
- All nodes: file system check and reboot. (Kees)
CEP4
- No Reboot needed. Was done last week(Hopko)
LEXARS
- No action. Were rebooted last week. (Hopko/Robin)
LCU
- Only 13 of them need reboot: CS004C CS021C CS024C CS026C CS101C CS501C CS302C CS401C RS509C RS508C DE605C SE607C FR606C
Central Services
- OS upgrade and reboot
LTA
- None
Aartfaac
- Reboot of nodes agc001,agc002, ads001, ais001…ais007 (Teun/Jasmin)
Core switches
- None
Software updates
MoM and related
- none
MAC/SAS
- none
CEP3
- Upgrade matplotlib to at least 2.2.1 (ref. ROHD-1004)
- Install lmfit (ref. ROHD-1022)
LCU
- None
CEP4
- None
Aartfaac
- None
COBALT
- none
LTA
- none