This is an old revision of the document!
LOFAR Status Meetings
LOFAR Status Meetings (LSM), presenting updates of the status of the telescope and discussing recent developments, are held bi-weekly at ASTRON. The meetings are also broadcast via Vidyo to everyone interested.
Please use a headset and please mute the microphone in the Evo session as long as you do not want to raise a question or say something.
Programme and Presentations
LSM Archive • 2015 • 2014 • 2013 • 2012 • 2011 • 2010 • 2009 • 2008 • 2007
| 2 March 2016 | ||
|---|---|---|
| E. Orru | Array Status and Observatory Update | |
| T. J. Dijkema | Update from FACTOR BW | |
| 2 March 2016 | ||
| A. Shulevski | Array Status and Observatory Update | |
| M. Brienza | Search and statistical modeling of dying radio galaxies in the LOFAR Lockman Hole | |
| D. Hoang | Reaching the thermal noise near A-team sources: the Sausage cluster case | |
| 17 February 2016 | ||
| R. Fallows | Array Status and Observatory Update | |
| J. Schaap | LTA status update | |
| S. ter Veen | Testing external transient buffer boards triggers from the 100m Effelsberg telescope | |
| T. Shimwell | Facet calibration busy week update | |
| 3 February 2016 | ||
| M. Iacobelli | Array Status and Observatory Update | |
| F. De Gasperin | Calibrating the LBA | |
| K. Emig | RRL and Nearby AGN | |
| R. Fallows | Simultaneous Nightside Interplanetary and Ionospheric Scintillation | |
| 20 January 2016 | ||
| S. ter Veen | Array Status and Observatory Update | |
| T.J. Dijkema | CITT2 update | |
| A. Schoenmakers | Software development update | |